Using LINKPlannerΒΆ

LINKPlanner allows the planner to design both PTP and PMP networks in the same project, using many common functions.

To achieve this goal, follow this process:

  1. Start the application and set options. See Starting the Application.
  2. Build a project to model a PTP link or PMP network See Projects.
  3. Enter details of all sites in the project. See Sites.
  4. Plan a PTP link, see Planning PTP links or plan a PMP network, see Planning PMP networks
  5. Adjust the link profile to allow for terrain height variance, clutter type (if using), obstructions and reflection. See Adjusting Link Profiles.
  6. View the Bill of Materials for the project. See Bill of Materials for Project.
  7. Manage the project, see Project Configuration.
  8. Export and report project, network, site and link data. See Exporting and Reporting